SUMMARY


Customer profile

ArcelorMittal Brazil, part of the global steel producer and mining company - ArcelorMittal Group, operates 6 state plants that produce steel for various industries.

Image Case Study Icon Customer Profile

Original installation

The original installation was a 2-stage design consisting of 40x M6 efficiency rigid pocket pre-filters and 40x F8 efficiency 12” deep box- style final filters. (efficiency per EN779: 2012)

Image Case Study Icon Original Installation

Site conditions

The blast furnace environment, laden with carbon, coke, and ore particles, has PM2.5 levels at 12.3 ug/m3 and PM10 at 22.1 ug/ m3—40% and 60% above WHO standards, respectively. High humidity averaging 69%, coupled with heavy dust, frequently causes pressure spikes and unplanned shutdowns.

Image Case Study Icon Site Conditions

Camfil solution

Camfil retrofitted the existing filterhouse with a new 2-stage static filter system. This design includes 80x T7 efficiency CamGT 3V-600 24” deep v-panel pre-filters and 40x T9 efficiency CamGT 3V-600 final filters. (efficiency per ISO 29461-1:2021)

Image Case Study Icon Camfil Solution Filter

Problem statement

The blast furnace, crucial for converting iron ore to steel in steel mills, incurs substantial financial losses during blower maintenance shutdowns. The original filter system in the filter house caused frequent maintenance due to high pressure drops, requiring pre-filter replacement every 42 days and final filters every 84 days.

Image Case Study Icon Problem Statement

Results

In response to the plant’s request to minimize maintenance downtime to just twice a year, the result was an improvement in filter lifetime, with pre-filters needing replacement only twice per year, and final filters needing replacement every 4 years during scheduled shutdowns.

Image Case Study Icon Results

RESULTS


Graph 1 first stage: Competitor filters experienced frequent pressure spikes and shutdowns every 40 days, needing replacement 8x per year had they continued using these filters. Camfil filters, however, showed stable pressure for 150 days, requiring only 2 replacements per year.

Graph 2 second stage: Competitor filters had increasing pressure drop shortly after installation and lasted only 84 days, needing replacement 4x per year had they continued using these filters. Camfil filters maintained low pressure drop for a year, lasting 1460 days (4 years), with a low and stable pressure drop, as reported by the customer.